Led the design and implementation of the Dew Point Control Unit at Abqaiq Plant, achieving a 15% improvement in process efficiency and reducing operational downtime by 10%, utilizing advanced PLC and SCADA systems in collaboration with JGC and Saudi Aramco (2025 - present)
•
Managed a cross-functional team of 12 engineers during the Electrical Equipment Replacement Project at Shedgum and Aindar GOSP, delivering the project 8% under budget and enhancing system reliability by 20% through the integration of smart electrical components and rigorous quality control with Al Gihaz Contracting (2023 - 2025)
•
Directed electrical and instrumentation activities for the Haradh & Hawiyah Gas Compression Project, implementing innovative troubleshooting protocols that decreased maintenance costs by 12% and improved safety compliance, leveraging expertise in DCS and fieldbus technologies alongside Tecnicas Reunidas (2022 - 2023)
•
Spearheaded the electrical engineering team for the Ras Tanura Refinery Clean Fuels Project, coordinating with Saudi Aramco and Tecnicas Reunidas to deliver a 25% increase in system uptime and a 30% reduction in energy consumption through the deployment of energy-efficient instrumentation and automation solutions (2018 - 2022)
•
Oversaw electrical system upgrades on the Borwin Gamma HVDC Converter Platform, achieving a 20% enhancement in power transmission efficiency and ensuring zero safety incidents by applying rigorous testing protocols and advanced diagnostic tools with DP World and TENNET (2017 - 2018)