Lambert Deep FEED Project (Woodside Engineering Limited): Western Australia Workshare: Lead Engineer
•
Deputation to PERTH, WESTERN AUSTRALIA Worley Parsons Office
•
The Greater Western Flank and the Lambert Deep gas project targets estimated recoverable gas reserves of 400 billion cubic feet
•
It involves the drilling and subsea tieback of new production wells to the existing infrastructure of the NWS project
•
The offshore gas development project comprises four production wells, including three production wells in the Greater Western Flank field
•
The project also involves top-side modifications on the Angel platform
•
The Angel platform, commissioned in 2008, is a not normally manned (NNM) production platform connected to the North Rankine offshore complex through 50km of subsea pipeline and umbilical
•
FEED of LNG subsea well heads and topsides tie in to existing tie in platform
•
Wood Side Data Remediation Project: Digital Enterprise venture Perth, Western Australia
•
Woodside commenced the creation of an Engineering Data Warehouse to publish the engineering data held on all their assets into a single source
•
The purpose of this EDW is to create an environment in which Woodside can determine the extent to which their class library is populated and to establish the discrepancies between the data sources
•
The business objective is to provide a single sustainable source of truth for all the prioritized data attributes on all Woodside assets which will provide the single source of truth environment
•
BPTT Mahogany Bravo Hub By-Pass Project: Detail Engineering Project
•
Client: Trinidad BP
•
The main project objective is to design a piping system/ network to allow production from Mahogany Alpha (18” Pipeline), Savonette (26” Pipeline) and Juniper (26” Pipeline) incoming line to by-pass Mahogany Bravo and enter the 40” departing line to Beach field to mitigate against production deferral the event the Hub goes down (Planned or Unplanned)
•
RTU Replacement / Retrofit Detail Engineering for 103 well head platforms of MARJAN and ZULF Fields: SAUDI ARAMCO - Lead Engineer
•
Deputation to SAUDI ARABIA Worley Parsons (MPP Office) throughout the year 2014
•
This project focus on detailed engineering for replacement / retrofitting of RTUs on103 platforms across MARJAN and ZULUF fields of Saudi Aramco
•
Intent is to maintain continuous data transmittal from I-Field equipment and well head platforms to SCADA system and as well as to optimize the production uptime
•
Lead the WP India RTU Project instrumentation team ensuring quality and performance clarify all the technical queries with MPP and client
•
Developing scope matrix and Scope of work document, RTU Purchase requisition RFQ along with MPP Office
•
Purchase order, NMR review, VDR, Integration support to Emerson OE SCADA
•
Was leading site survey of 103 Offshore Saudi ARAMCO Well head platforms (ZULF & MRJN) - electrified and solar powered wellheads, tie-in platforms, prepared survey report and recommended RTU replacement or retrofit including mark-up for relocation in case of a replacement platform
•
RTU to ESD, PDHMS, SWC, MPFM, and ESP interface verification on site and space identification in RTU panel for future i-field equipment interface
•
PDHMS Installation on 11 Oil Well Platforms of QATIF and SAFANIYA fields: SAUDI ARAMCO Project – Lead Engineer
•
Deputation to SAUDI ARABIA Worley Parsons (MPP Office) to lead the project
•
Conducted site survey for the 11 offshore platforms and propose the location of SDAU Panel in the Non-Hazardous Area (Safe Area) on the existing Hazardous Area Classification Layout
•
Check for the feasibility of the proposed location of the SDAU Panel for PDHMS system with the Structural and Piping discipline
•
ESTIMATION FOR BG GAS LIFT PROJECT PROPOSAL, BG Exploration and Production India Limited (BGEPIL)
•
Man-hour estimation for the engineering activities
•
Review of input documents and scope of work
•
Prepare scope clarification query and discuss with client
•
Finalize the deliverable list and project activities and deliver the same
•
IEWO-ONGC Bassein Development project, Pre-bid for Well head platform: ONGC, Mumbai, India
•
Conduct budgetary TBE and TQ for Valves, Shutdown panels (SDP) and well head control panels (WHCP), HIPPS system and instruments
•
Reviewing and quality checking all document deliverables (Instrumentation) in accordance with relevant Project codes and international standards
•
ADMA – OPCO As-built project for ADNOC, Abu Dhabi
•
The main scope of the project was to replace existing Engineering Archive with an as-built data and document warehouse (EIMS - Engineering Information management System) utilizing latest AVEVA Net digital technology for ADMA OPCO assets at two of their fields
•
The scope included data collection, site surveys, desktop verification, laser scanning, primitive and intelligent 3D models, along with P&ID and instrumentation databases
•
All deliverables were then loaded into re-configured data warehouse which provides instant access to accurate and reliable information
•
Through the General Agreement on Participation, ADNOC took over 60% of the interests in ADMA and became the reference shareholder
•
Rosebank FPSO FEED Project, North Sea, UK
•
Project scope is to build an FPSO for the Rosebank oil and gas field in the UK North Sea
•
The FPSO should also be able to store 1 million barrels of crude oil capacity to be offloaded into shuttle vessels, while the gas will be exported through pipeline to the Shetland Islands
•
Worley carried out the pre-FEED for the FPSO
•
In July 2012, WorleyParsons was awarded the contract for FEED study along with INTECSEA
•
My work scope was preparation of deliverables Index, I/O list, and datasheets in SPI database
•
FEED P&ID reviews