•
Critical Line List Preparation
•
Line Modeling & Setup of various load cases in Caesar II
•
Nozzle Load Calculations WRC- 107& Calculations ASME B31.3 code
•
Analysis of critical Piping system of pumps by API 610 ,Pressure Vessels,Storage Tanks
•
Dynamic analysis
•
Client Review in Software –Navisworks
•
Stress Reports MS- Office
•
Coordinated with the staff in areas , completing assignments of project design for client’s divisional project studies
•
Attended in plant model review meetings and reported project status to the Project Manager
•
Prepared specifications and requisitions for expansion joints, spring hangers, constants, and pre-insulated pipe supports
•
Reviewed and approved project deliverables and stress calculations while ensuring compliance with internal specifications, standards, and industry practices
•
Lead small to medium-sized projects through all stages of design from concept to handover to Construction
•
Proactively collaborated with internal teams to meet project commitments, costs and schedules
•
Projects: ADNOC Abudabi, Veolia Abudabi, Orlen-Lietuva –Residue hydrocracking Unit Europe, IOCL Gujarat– INDIA-Reformer Unit of Hydrogen Modification, CDW- Refinery, Tank Farm Piping-API 650, oil & Gas Metering skids, Process Piping