Leslie Alexander Lawrence

[email protected] +628127577098 Indonesia

PROFESSIONAL SUMMARY

Dynamic and results-driven EPC Project Manager with over 10 years of international experience in the Oil & Gas and Power Plant sectors. Proven track record of successfully managing multimillion-dollar projects, including a $25M LNG facility that achieved a 15% reduction in operational costs through innovative quality management practices. Adept at leading cross-functional teams to deliver projects on time and within budget while ensuring compliance with industry standards. Committed to driving efficiency and enhancing project outcomes through strategic planning and execution.

WORK EXPERIENCE

Sites Asset Manager SME
Greenvillelng Nigeria
Developed Flawless Startup Documents with new FPU Unit Nigeria - LPG LNG Trains 4-5 Assets
Planning immediate updates of all yearly and bi-yearly shutdowns turnarounds and building of new planning professionals
Fleets Management 350 20-ton LNG – LPG Transport Trucks
Sites Construction Commissioning Preservations of Materials
Asset Safety: Preventing accidents and protecting the health of people and the environment
Asset Maintenance: Implementing preventive and predictive maintenance strategies to extend assets life
Turnarounds Maintenance Commissioning Manager
RLG International Shell Bukom Singapore , Singapore
Manager turnaround reliability catalytic cracking unit (LRCCU)
Planning Management all commissioning areas, rebuilds Valves, PSV, Motors, Pumps, Rotating Equipment
Inspections and Management Supervision Contractors
Planning Management P-6
Development of reduced and controlled spares lists
Workshop Manager turnaround CD-3 Unit
Planning all rebuilds Valves, PSV, Motors, Pumps, Rotating Equipment Reliability
Project Manager Maintenance Reliability & Shutdowns Commissioning & Planning
Shell Oil Gas Nigeria , Nigeria
6 LNG Trains Maintenance Reliability & Shutdowns & Planning
Manpower and all planning 6 LNG Trains – Bonny Island
This includes all commissioning of new FPU equipment and training of employees
Spare parts and equipment management including all preservation of all areas including power generation requirements
Establish Operations Maintenance Excellence requirements
General Manager Maintenance Operations Excellence
PETRONAS Malaysia , Malaysia
Reliability Rotating Equipment Gas Plants, LNG Trains, and all international work sites – Flawless Start-up Floating LNG FSPO – FPU
Overview and planning with new sites and development of commissioning teams and training
This was a new department that my teams will develop and handover to the Malaysian Nations by January 2015
This has been completed and is being used by all Petronas sites worldwide
Integrity & Reliability Excellence with management of all areas listed below and world class performance with all PETRONAS oil and gas up and downstream sites in the world that also includes LNG Offshore Plants
My job is to develop PETRONAS into a world class operations and maintenance company
Rotating Equipment Reliability Manager
Cairn Oil and Gas Delhi India , Delhi, India
Responsible all budgets that include the developing of client’s gas plants
Relationships with the repair of all site rotating equipment’s that includes gas reinjection compressors, frame nine generators, and all pipelines and FPSO FUP vessel
Deration 3.5 Years
Project Asset Maintenance Integrity Manager
KPO Chevron Kazakhstan , Kazakhstan
Shutdown – Reliability Cranes, Rotating Equipment, Power Plants, & Turnarounds & commissioning Maintenance
Increase the volume of Preventive Maintenance Commissioning and Maintenance management or 6 Frame 9E Generators
Two of the generators are dual fuel units
Total Frame 9E Power Capacity = 738 MW (6-123.4 MW
Major inspections, Hot Gas Path inspection, Combustion
Managed the following activities in the respective machines Frame-9E: major inspections 6 machines, Hot gas path Inspection on one machine, Combustion Inspection on two machines
Nature of Frame 9E Shutdown Maintenance Duties in Brief Removal of G.T. rotor, compressor rotor, generator rotor etc., Inspection of the above components
Power Plants Manager
Chevron TCO Tengizchevroil Kazakhstan , Kazakhstan
Maintenance Reliability Rotating Equipment Manager with 263 Employees
POWER Plant 1 included 9 x 126 MW GE 7FA, 9 HRSG and 5 x Steam Turbine Generators; Responsible for erection of all mechanical maintenance equipment at the power station
POWER Plant 2 included 4 x 50 MW GE LM6000; Balance of Plant; Water Treatment Plant and Effluent Treatment Gas Plant. Duties included: Site Project and Engineering Management Services; Management of EPC Contractor’s Design Review and Approval of Services; Structural Works and Electro-mechanical Management at Construction Phase
POWER Plant 3 included 4 x 130 MW GE Frame 9E; Balance of Plant; Water Treatment Plant and Effluent Treatment Gas Plant. Duties included: Site Project and Engineering Management Services; Management of EPC Contractor’s Design Review and Approval of Services; Structural Works and Electro-mechanical Management at Construction Phase
Maintenance Operations Manager - Hydrocracker Unit – UOP
Chevron Unocal Indonesia Balikpapan Indonesia , Balikpapan, Indonesia
EPC Feed Construction Commissioning
Site Project Supervisor Maintenance HSE Construction Chemical Plant Training LNG Plant Commissioning Off Shore Platform of Unocal, Balikpapan office
Maintenance Supervision of all production LNG LPG Operations oil and gas
Maintenance and director of production team’s activity off shore Rig, was under my control
Taking sample of oil/crude oil from lot of Platform and introduce all equipment involved during process of oil production with all pipe accessories attached along pipeline
Managed teams for group turbine assembly from beginning assembling unit of turbine until ready for operation
Managed all the subcontractor for supply spare-part and service for completion of unit assembly Gas Turbine
The Bontang LNG plant, operated by Unocal in East Kalimantan, Bontang, Indonesia, processes the gas from a huge reserve discovered in at Badak Field, East Kalimantan, as well as the Samberah, Nilam and Mutiara fields
Cracker plant increases to 170,000 bbl./day
Wrote all work rules and Operations maintenance procedures
Joint Venture Unocal – Chevron Refining Units involved are Vacuum Distillation Unit, Hydrocracker, Platforming unit, Atmospheric Distillation

EDUCATION

Chemical Engineer
University Wisconsin
Advanced Technician in Industrial Boiler making and Piping works
Shell Philippines
Welding Engineer Inspection Course
Indonesia
COFREND level II: X Rays, Die Penetrant Testing, Sealing Testing
Chemical & Petrochemical Qualifications
GIES 2, H0B0
Off-shore Qualifications
BOSIET – HUET
Polymer chemicals specialist with water injections
SNF Chemicals France

SKILLS

Similar Resumes You May Like

Kilian Niß

Praktikum Elektrotechnik

SYED MUHAMMAD TALIB

IT Support Technician

SHYAM SATHISH

Senior Executive-Logistics

Muddasirmateen Shaikh

Software Development Engineer

SHANICE LUZHANE JOHNSON

Quality Assurance Consultant