In charge of system module and system integration for Contour Department
•
Managing product transfer from Santa Barbara (US) to Penang
•
New Start-Up Company
•
Transferring NPI products directly from US (Santa Barbara)
•
ISO90001:2005 certified internal auditor
•
SAP Material Management Knowledge-MM01,MM02,MM03,CS01,CS02,CS03,CS14,ZMM01,CA01,CA02,CA03,MMBE,LS21,LS41,LT01,LT02,LT03,LT06,LT24,LS24,CO03,CO11
•
Smart Torque-Desoutter knowledge
•
Attend CE! Audit & POR Audit
•
Involve in launching of New Product Introduction (NPI) by providing technical input and being the Project Lead for Phase 1 (Design stage), phase 2(feasibility study),phase 3(prototype build) and phase 4 ( product masspro release)
•
Involve in NPI-PLC management
•
Product under my care is Contour-Equipment to measure surface topography
•
Actively working with sourcing departments for localization
•
Knowledge on Jira & Confluence
•
Participation in localization and second source project. To provide technical inputs and advice to buyers and suppliers
•
Perform Repair & Refurbishment activities
•
Team lead for a group consisting of 3 engineers & 11 technicians
•
Project Lead for Second Source Vendor Qualification. Succesfully led the team to find an alternate source for retired vendor. Worked together with buyer, planner,quality, engineering, R&D & production team to qualify the second vendor. Total parts affected-54 parts
•
Involved in product improvement project. Wafer chuck used in surface topology system having flatness issue, worked with R&D to improve the design. Customer return rate goes down & design is fully succesful
•
Make sure that the cost of the product in SAP is tally with finance report. This is done by running SAP CO03 cost analysis, checking if the materials are fully consumed in MB1A, checking if the labor cost is correct, checking if there is a material price change during the project is running until the project ends. Provide the justification to finance department
•
Participated in Lead Time Improvement project. Succesfully pulled quantity for upcoming quarter to the current quarter. Lead time is shortened with the strategy of building as much modules assembly as possible upfront